Our Experiences
2.0 Construction with HyperBIM technology and IBS System
Implementation of Technology and Process Improvement
Low Cost and Affordable Housing
- 60 units of Rumah untuk Rakyat Besut, Under the Parliament of Besut, Terengganu
Lekir, Manjung Perak
- 50 units of My Beautiful New Home Bungalow Houses for B40 under Ministry of Finance in Lekir, Manjung, Perak Darul Ridzuan
Merlimau, Jasin Melaka
- 50 units of My Beautiful New Home Bungalow Houses for B40 under
Lumut Manjung, Perak
- Pembangunan Perumahan Perwira Negeri Perak yang Mengandungi 300 unit Rumah Teres Setingkat Di Mukim Lumut Manjung, Perak Darul Ridzuan
Low Cost Houses for B40
50 Units in 100 Days HyperBIM System
by Ascension Technology
Building Information Modelling
HyperBim Low Cost Houses for B40



Day 1
Progress site work activity:
- Concreting work for slab already done casting.
- Setting out need to be done on top of the slab before start doing the installation of the formwork.
- The installation of the formwork need to referred based on the alignment that have been set up by the license surveyor.
- Installation of the formwork started.



Day 2
Progress site work activity:
- Installation of formwork continuously in progress.
- BRC installation work started.
- Electrical installation work started.



Day 3
Progress site work activity:
- Installation of formwork continuously in progress for exterior and interior of the house.
- BRC installation work continuously in progress.
- Electrical installation work continuously in progress.



Day 4
Progress site work activity:
- The installation of bracing started once completed install all the formwork.
- The installation of the bracing is to ensure that all the formwork are tied strongly before start concreting work.
- The method using to fixed the bracing part to the formwork is bolt and nuts method.



Day 5
Progress site work activity:
- Concreting work started.



Day 6
Progress site work activity:
- Formwork dismantle.
- Concrete result satisfied.



Day 7
Progress site work activity:
- Roof truss installation work started
Pandangan Hari Ke 75
Eagle Eye View Of Completed Low Cost Houses for B40


The Latest Concept Of HyperBIM
HyperBIM
- Reduce cost
- Deliver on time
- Increase productivity
- Community participation
- New technology (fastbuild + BIM)
Summary of Low Cost Projects
Low Cost Housing @ Lekir, Perak | Jan 2017 | Perak State Gov |
Low Cost Housing @ Jasin, Melaka | July 2017 | Melaka State Gov |
PPRT Low Cost Housing @ Kuala Terengganu, Terengganu | Nov 2017 | Terengganu State Gov |
Low Cost Housing @ Kubang Pasu, Kedah | Feb 2018 | Kedah State Gov |
Low Cost Housing @ Marang, Terengganu | Feb 2018 | Terengganu State Gov |